A play tower is the item that makes a park recognisable. It is also the item where custom design most often goes wrong, because the gap between an architect's sketch and a manufacturable, certifiable structure is wider than it looks. This is how the process actually runs.

Step 1: constraints Prima creativity
Before any sketch, four numbers decide the design: available footprint, fall height allowed by the surfacing budget, maximum deck height permitted by local play safety rules, and the maintenance access route. A tower that ignores any of these will be redesigned at the shop-drawing stage, which is the most expensive place to redesign.
Step 2: structure and cladding
| Part | Typical specifica |
|---|---|
| Posts | Galvanised steel, 3 mm wall, powder topcoat |
| Decks | HDPE or coated plywood with drainage gaps |
| Rivestimento | HDPE pannelli, UV-stable, 15 mm |
| Tetto | Moulded HDPE or steel with a fall for runoff |
| Slide | Stainless, formed exit, drenaggio holes |
| Net and rope | Steel-core, UV-stable sheath, swaged raccordi |
Step 3: the drawings that matter
Three documents turn a concept into an order: a general arrangement drawing with dimensions and fall zones, a footing plan with loadings, and a hardware and component schedule. If a supplier quotes from a picture without these, the site will discover the difference during installation.
Step 4: prototyping the tricky parts
Custom towers are usually standard components in a new arrangement, with one or two genuinely new parts — a curved roof, an unusual net, a themed panel. We prototype those parts in the workshop and photograph them before production starts, which is cheaper than discovering a clash on site.
Step 5: packing by assembly sequence
A tower arrives as hundreds of parts. Packing by assembly stage — posts and footings first, decks second, cladding and roof last — turns a two-day installation into a one-day one and removes the most common installer complaint.
What custom actually costs
Custom design adds engineering time and a small premium on components, but the structure is usually not what drives the budget — surfacing, footings and installation do. A simpler tower on better surfacing is almost always the better park.
Domande frequenti
Can we supply our own design?
Yes, with drawings; we check it against manufacturability and safety rules and quote the changes needed.
How long does a custom tower take? Eight to ten weeks from approved drawings.
Is a themed tower worth it? If it is a destination park, yes; for a neighbourhood playground, standard components serve better.
Have a concept? Send the sketch and the site constraints — we will return a manufacturable layout with fall zones and footings.