A US parks district replaced an ageing play area next to a civic building with a custom play sculpture, a spring rocker zone and a shade structure. In the United States the buying decision is shaped less by catalogue choice than by two documents: the CPSC Public Playground Safety Handbook and ASTM F1487. Everything we supplied had to be documented against them.

What US buyers actually check
- Fall height and surfacing — the critical height of each component determines the depth of the protective surface, and the inspector will measure it.
- Entrapment and entanglement — head and neck openings, and anything that can catch drawstrings.
- 金物 — tamper-resistant fasteners, no exposed bolt ends at child height, no openings between 3.5 and 9 mm.
- バリアフリー — an accessible route to the play area and to at least some elevated play components, per ADA guidance.
What was installed
| 製品 | Detail | Qty |
|---|---|---|
| カスタム play sculpture | Climbing net and slide combination, 2.1 m deck height | 1 |
| スプリング rockers | Two-seat see-saw and single rockers, 5–12 age band | 4 |
| Shade 構造 | Four-column sail over the play zone and seating | 1 |
| Surfacing | Poured-in-place rubber, 100 mm, with wear course | 全体 zone |
| Seating and access | Benches, accessible ルート, bike rack | 1 セット |

Shade is a safety item, not an extra
On a west-facing site with summer surface temperatures that make metal slides unusable by 2 pm, shade changes how long the playground is usable. We specified a fabric rated for UV and wind load, with columns set outside the fall zone so the structure does not become a collision hazard. The district's risk manager asked for the wind-load calculation; we supplied it with the shop drawings.
なぜ poured-in-場所 ゴム here
Loose fill is cheaper, but on a site with a maintenance crew of two and a busy summer programme, the district wanted a surface that does not need raking. Poured-in-place rubber costs more upfront and needs a proper base; the trade-off is a surface that meets the fall-height requirement and stays in place.
Documentation 包装
Shop drawings, fall-height calculations per component, hardware schedule, surfacing depth plan, installation manual and the maintenance checklist the district files for its annual inspection. In the US, this documentation is often the difference between passing inspection and cutting equipment out of the ground.
よくある質問
Do you supply ASTM test reports?
We supply the design data and the reports we hold; where a specific ASTM clause must be witnessed, we arrange third-party inspection before loading.
Can the play sculpture be customised?
Yes — layout, colours and theme elements are adjustable, with the fall-height recalculation included.
What lead time should a district plan for? Ten to twelve weeks including surfacing and inspection scheduling.
Replacing a US play 面積? Send the site plan, age band and the inspection standard your district uses — we will return a layout with the documentation list.