Venues that host events cannot install equipment when it suits the supplier. They install it in the gap between the last fixture and the first pre-season booking, and everything must arrive complete, labelled and ready to fit. That constraint shapes how an equipment package should be planned.

Start from the calendar, not the catalogue
The first document we ask for on a venue project is the event calendar. A four-week closure is a different project from a two-week one: it decides whether foundations are pre-cast or cast in situ, whether equipment arrives in one shipment or three, and whether installation is done by the venue's team or a contractor.
What a venue package includes
| 카테고리 | 제품 | 배송 timing |
|---|---|---|
| 고정된 | 골 posts, sockets, 벽 plates, anchorages | First — needs 콘크리트 시간 |
| 구조 | Frames, backstops, fencing | Second — 무거운 lift access |
| Loose | Nets, mats, benches, carts | 지속되다 — needs 저장 |
| Consumable | Line 페인트, 네트 spares, 볼 가방 | With the last delivery |
Labelling by zone and by step
The single biggest time saver on a venue installation is packing to the installation sequence. When a crate is labelled "Zone B, step 2" the crew does not open it early, does not lose the hardware, and does not have to sort 400 cartons to find one bracket. We supply a packing list that mirrors the drawing, and venues keep it for the next refurbishment.
Access is a specification item
Gates, tunnels, lifts and service corridors decide the maximum size of a crate. A venue that cannot get a 2.4 m crate to the pitch will need the frame split, which must be designed in, not improvised on site. We ask for photographs of the access route before finalising packaging.
저장 사이 계절
Venues rarely have enough storage. Specify wall-mounted racks and stackable trolleys, and plan where the equipment lives in the off-season, or it will be stored in a corridor and damaged before the next event.
자주 묻는 질문
Can you ship in phases?
Yes — fixed items first, loose items last, with each phase separately documented.
Do you attend installation?
For venue packages we send a supervisor for the first two days of the fixed works.
What about spare parts? We recommend a kit of nets, springs, bolts and bearings sized for one season of events.
Managing a venue programme? Send the calendar, access photos and drawings — we will propose a delivery plan in phases.