A Brazilian municipality built a public sports complex on a sloping site: skate bowls and street elements at the top, a floodlit community pitch at the bottom, and a shaded concourse between them. Our scope was the steel and equipment package — fencing, goals, seating, fitness stations and the shade structures — for a site where the sun and the rainy season set the schedule.

Twee climates, een plaats
The site gets intense sun for eight months and short, heavy rain for four. That combination punishes three things: coatings, drainage and anything with a sealed cavity. We specified hot-dip galvanising plus a topcoat on all steel, drainage slots in every base plate and post cap, and stainless fixings throughout — not because the coast is salty, but because humidity plus heat accelerates corrosion in enclosed sections.
What was supplied
| Zone | Detail | Qty |
|---|---|---|
| Community pitch | Goals with counterweights, ball-stop netting 5 m, benches | 2 + 1 set |
| Skate gebied edge | Staal handrails, seating blokken, litter bins | 1 set |
| Geschiktheid strip | 8 outdoor stations along the concourse | 8 |
| Shade | Two sail structures over seating and fitness strip | 2 |
| Fencing | Powder-coated panels, 1.5 m, with maintenance gates | 140 m |

Shade as equipment, not decoration
On a site used from 6 am to 10 pm, shade decides whether the fitness strip is usable at midday. We treated the sails as part of the equipment package: columns anchored with the same footing details as the fitness stations, and fabric rated for UV and wind load. The municipality's maintenance team can remove the fabric before storm season without dismantling the frame.
Night use and lighting
The pitch is floodlit and booked until 10 pm, which makes it the busiest asset on site. Goals and netting were positioned to the light grid rather than the other way round, because moving a light column costs far more than moving a goal. Fencing height was raised behind the goal to stop balls reaching the residential street.
Sequencing around the rainy season
Concrete work on the skate area was done in the dry months; our steel package was delivered in two shipments to match the site's storage capacity, which is the practical constraint on most municipal sites in dense neighbourhoods. Installation was done by the municipality's contractor with our drawings and one supervision visit.
Veelgestelde vragen
Can shade sails be supplied with the equipment?
Yes, including the column footings drawing; the fabric is usually replaced locally every 5–7 years.
Is galvanising necessary inland?
For humid climates with heavy rain, yes — powder coat alone on a sealed section is where rust starts.
What about vandalism? Nuts are tamper-resistant, bins and benches are through-bolted, and netting is steel-core.
Gebouw a public sport- complex? Send the site levels, the sports mix and the rainy-season window — we will quote the steel package in phases that match your storage.