Step 1: constraints önce creativity

Before any sketch, four numbers decide the design: available footprint, fall height allowed by the surfacing budget, maximum deck height permitted by local play safety rules, and the maintenance access route. A tower that ignores any of these will be redesigned at the shop-drawing stage, which is the most expensive place to redesign.

Step 2: structure and cladding

PartTypical Şartname
PostsGalvanised steel, 3 mm wall, powder topcoat
DecksHDPE or coated plywood with drainage gaps
KaplamaHDPE paneller, UV-stable, 15 mm
çatıMoulded HDPE or steel with a fall for runoff
SlideStainless, formed exit, drenaj holes
Net and ropeSteel-core, UV-stable sheath, swaged bağlantı parçaları

Step 3: the drawings that matter

Three documents turn a concept into an order: a general arrangement drawing with dimensions and fall zones, a footing plan with loadings, and a hardware and component schedule. If a supplier quotes from a picture without these, the site will discover the difference during installation.

Step 4: prototyping the tricky parts

Custom towers are usually standard components in a new arrangement, with one or two genuinely new parts — a curved roof, an unusual net, a themed panel. We prototype those parts in the workshop and photograph them before production starts, which is cheaper than discovering a clash on site.

Step 5: packing by assembly sequence

A tower arrives as hundreds of parts. Packing by assembly stage — posts and footings first, decks second, cladding and roof last — turns a two-day installation into a one-day one and removes the most common installer complaint.

What custom actually costs

Custom design adds engineering time and a small premium on components, but the structure is usually not what drives the budget — surfacing, footings and installation do. A simpler tower on better surfacing is almost always the better park.

SSS

Can we supply our own design?
Yes, with drawings; we check it against manufacturability and safety rules and quote the changes needed.

How long does a custom tower take? Eight to ten weeks from approved drawings.

Is a themed tower worth it? If it is a destination park, yes; for a neighbourhood playground, standard components serve better.

Have a concept? Send the sketch and the site constraints — we will return a manufacturable layout with fall zones and footings.

İlgili ürünler

En çok satan Spor malzemeleri ürünlerimiz: premium kalite ve rekabetçi fiyatlar

Tüm ürünleri gör
İletişim numarası:+86 13230761319
WeChat QR code
WhatsApp QR code Şimdi sohbet et
Başa dön