Mengte creates value for customers, opportunities for employees, benefits for enterprises, and progress for society

Arena and Stadium Refurbishment: Equipment Scope Beyond the Seats

2026-11-27
mengtesport ekibi
0 görüntüleme

When an arena is refurbished, the visible budget goes to seating, lighting and the playing surface. The equipment that actually determines how the building operates — backstops, court dividers, training rigs, storage and access control — is usually decided late, which is why it is often the item that delays opening.

Concrete-domed sports arena exterior in Italy

The scope nobody lists early

AlanTypical teçhizatYaygın omission
Playing alanBasketball backstops, volleyball and handball posts, floor sleevesSleeve positions finalised after the floor is laid
EğitimRigs, plaka depolamak, mat trolleysStorage depth and door widths
OperationsMahkeme dividers, top carts, scorer mobilyaRetraction clearance behind the goal
AccessPlayer gates, teçhizat kapılarWidth for the largest equipment item

Backstops decide the ceiling and the wall

Ceiling-suspended backstops need structural fixing points designed into the roof structure; wall-mounted units need a wall capable of taking the load and enough clearance for the arms to fold. Both decisions belong in the structural phase, not the fit-out phase. On refurbishments, we ask for the as-built structure drawings before quoting, because a 1970s arena rarely matches its original drawings.

Floor sleeves: cheap to add, expensive to retrofit

Volleyball, badminton and handball post sleeves cost very little when cast into a new floor and a great deal when core-drilled into an existing one. On a refurbishment, mark every sleeve position on the floor plan before the screed goes down, including the sleeves you might not need for five years.

Storage and circulation

Arena storage is always smaller than the equipment list. Mats, posts, nets and carts need a room with a door wide enough to take a mat trolley and a floor strong enough for stacked weights. If the room does not exist, specify wall-mounted storage so equipment does not live in the corridor.

Phasing etrafında olaylar

Arenas cannot close for long. Equipment is usually installed in the gap between the last event of the season and the first pre-season fixture, which means the equipment must be delivered complete, labelled by zone, and installable by a small crew. We ship arena packages with per-zone packing lists for exactly this reason.

SSS

Can old backstops be reused?
Sometimes the frames can, but anchors and springs rarely meet current expectations; the survey decides.

Do you work from as-built drawings?
Yes, and we ask for a site survey where the drawings are older than ten years.

What is the lead time for an arena package? Eight to ten weeks, with the sleeves supplied first if the floor is still open.

Refurbishing an arena? Send the structure drawings and the event calendar — we will quote in phases that fit your closure window.

İlgili ürünler

En çok satan Spor malzemeleri ürünlerimiz: premium kalite ve rekabetçi fiyatlar

Tüm ürünleri gör
İletişim numarası:+86 13230761319
WeChat QR code
WhatsApp QR code Şimdi sohbet et
Başa dön