A municipality in northern Italy converted a redundant asphalt yard behind a sports hall into a free-access sports zone: calisthenics and street workout under shade sails, a small skate area, and a marked running loop that ties the two together. The project is interesting because it was funded in one budget but delivered in two phases, which is increasingly common across Italian municipal projects.

The design problem
The yard had three constraints: summer surface temperatures that make unpainted steel unusable at midday, a boundary wall that limited the number of anchor points, and a school next door that needed the area quiet during exam weeks. The answer was shade, colour and layout rather than more equipment.
What was installed
| Zone | Detail | Qty |
|---|---|---|
| Street workout rig | Hot-dip galvanised frame, 10 stations, shade sail above | 1 |
| Calisthenics istasyonlar | Pull-up, dip, ab bench, Swedish ladder, parallel bars | 6 |
| Running loop | Two-lane marked track, 180 m, with distance markers | 1 |
| Skate elements | Concrete ledges and quarter, no moving parts | 1 ayarlamak |
| Lighting-ready columns | Pre-drilled for phase two lighting | 4 |

Heat, colour and coating
Dark steel in direct Italian summer sun reaches temperatures that make bare-hand contact unpleasant and, on some coatings, causes early chalking. We specified a light powder colour on the hand-contact surfaces, a heavier coating build on the frame, and shade sails over the rig. The shade also protects the rubber surfacing, which extends its life by years on a south-facing site.
Two-phase teslimat olmadan a second Tedarikçi
Phase one was the rig, stations and surfacing. Phase two, twelve months later, added lighting and the skate elements. We held the drawings between phases so the anchor positions and cable routes stayed consistent. That is the practical argument for buying the whole zone from one supplier even when the budget arrives in two parts.
Alan issues worth noting
- Duvar anchors — the boundary wall was cavity construction, so wall-mounted bars were replaced with free-standing frames on base plates.
- Drenaj — the yard fell towards the school entrance; the running loop was re-graded rather than levelled, which avoided a new drainage connection.
- Noise — rubber tiles under the skate ledges reduced impact noise during school hours.
SSS
Is shade equipment or construction?
We supply the sail and frame as part of the equipment package; foundations are usually cast by the site contractor.
Can the running loop be added later?
Yes, but mark it at the same time as the equipment layout so the two do not conflict.
What standards apply? EN 16630 for fitness stations, EN 14974 for skate elements, and local municipal safety rules on fall zones.
Planning a free-access spor zone? Send the site dimensions and the phases you have funding for — we will quote each phase separately with a shared layout.