Mengte creates value for customers, opportunities for employees, benefits for enterprises, and progress for society

Indoor Arena Equipment in Hungary: Retrofitting a Multi-Event Hall

2026-11-27
mengtesport團隊
0次瀏覽

A Hungarian arena hosts handball, indoor football, concerts and exhibitions. That mix means the equipment cannot be permanent: goals, backstops and court dividers have to appear and disappear within a changeover window measured in hours, not days.

Hungarian indoor arena co<i></i>nfigured for an event with retractable seating and court markings

The changeover problem

An arena that hosts four event types needs equipment that stores compactly, moves on its own wheels, and can be installed by two people. Every item that requires a forklift or four riggers is an item that will not be used on a tight turnaround.

What was specified

產品DetailQty
Handball goalsWheeled, folding, with floor-protection tyres4
Basketball backstopsWall-mounted 摺疊 arms, lockable 平2
球場 dividersRetractable netting on floor sleeves2 套
Goal and equipment storageNesting trolleys with brakes6
地板 防護Rubber mats for goal bases and trolley routes1 套

Floor protection is not optional

The arena floor is a lacquered timber system that also hosts exhibitions with vehicle access. Steel goal bases and trolley castors will mark it within weeks unless every contact point is rubber-tyred and every route is matted. We supplied the tyres and the route plan together, because specifying one without the other is how floors get damaged.

Storage within the building

The arena has one store at court level and a service corridor. Goals nest against a wall, dividers retract into sleeves rather than rolling up, and trolleys have brakes so they do not migrate during an event. The result is a changeover that two staff can complete between a morning school session and an evening match.

Considerations for event venues

常見問題

Can handball goals be used outdoors?
The wheeled version is indoor-specific; outdoor goals need a different anchoring system.

Do dividers 需要 地板 工作? Yes, sleeves; retrofitting into an existing floor requires core drilling during a closure.

What lead time? Six to eight weeks for a standard package.

Upgrading an arena? Send the event mix and the changeover window — we will propose equipment a two-person crew can handle.

相關產品

我們熱銷的體育用品產品,品質卓越,價格實惠

查看全部產品
聯絡電話:+86 13230761319
WeChat QR code
WhatsApp QR code 立即聊天
回到頂部